Gas transmission pipeline · Villa de Reyes to El Sauz
Tula-Villa de Reyes Gas Pipeline
Tula-Villa de Reyes Gas Pipeline is an operating gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 206 km long and 9.05 bcm/y of capacity, starting up in 2022. It runs from Villa de Reyes to El Sauz. It is owned by TC Energy Corp.
Length
206 km
Capacity
9.05 bcm/y
6.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Tula-Villa de Reyes Gas Pipeline runs from Villa de Reyes to El Sauz. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Villa de Reyes
- To
- El Sauz
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 188 km
- GEM pipeline ID
- P1268
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| North section | Operating | Villa de Reyes → El Sauz | 206 | 9.05 | 914 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- TC Energy Corp100%