Gas transmission pipeline · Tula to El Sauz
Tula-Villa de Reyes Gas Pipeline
Tula-Villa de Reyes Gas Pipeline is an under construction gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 110 km long and 9.05 bcm/y of capacity. It runs from Tula to El Sauz. It is owned by TC Energy Corp.
Length
110 km
Capacity
9.05 bcm/y
6.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Tula-Villa de Reyes Gas Pipeline runs from Tula to El Sauz. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Tula
- To
- El Sauz
- Start country
- Mexico
- End country
- Mexico
- Countries crossed
- Mexico
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 110 km
- GEM pipeline ID
- P6574
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| South section | Under construction | Tula → El Sauz | 110 | 9.05 | 914 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- TC Energy Corp100%