Gas transmission pipeline · Rio Blanco County to San Juan County
TransColorado Gas Pipeline
TransColorado Gas Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 499 km long and 10.22 bcm/y of capacity, starting up in 1996. It runs from Rio Blanco County to San Juan County. It is owned by Kinder Morgan Inc.
Length
499 km
Capacity
10.2 bcm/y
7.5 Mtpa LNG equivalent
Segments tracked
1
Route
TransColorado Gas Pipeline runs from Rio Blanco County to San Juan County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Rio Blanco County
- To
- San Juan County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 481 km
- GEM pipeline ID
- P0270
- Start year
- 1996
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Rio Blanco County → San Juan County | 499 | 10.2 | — | 1996 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.