Gas transmission pipeline · Warri to Hassi R'Mel
Trans-Sahara Gas Pipeline
Trans-Sahara Gas Pipeline is a shelved gas transmission pipeline crossing Nigeria, Niger, Algeria. The tracker lists 1 tracked segment, 4,128 km long and 30 bcm/y of capacity, starting up in 2030. It runs from Warri to Hassi R'Mel. It is owned by Sonatrach SpA, Nigerian National Petroleum Corp and Niger Ministry of Petroleum, Energy and Renewable Energies.
Length
4,128 km
Capacity
30 bcm/y
22.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Trans-Sahara Gas Pipeline runs from Warri to Hassi R'Mel. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Warri
- To
- Hassi R'Mel
- Start country
- Nigeria
- End country
- Algeria
- Countries crossed
- Nigeria, Niger, Algeria
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 2,398 km
- GEM pipeline ID
- P0460
- Start year
- 2030
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Shelved | Warri → Hassi R'Mel | 4,128 | 30 | 1219 mm | 2030 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.