LNG Chain

Gas transmission pipeline · Barrancabermeja to Ballena

TGI Pipeline Network

TGI Pipeline Network is an operating gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 771 km long and 2.66 bcm/y of capacity, starting up in 1996. It runs from Barrancabermeja to Ballena. It is owned by TGI SAS E.S.P.

Length

771 km

Capacity

2.66 bcm/y

2.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 457 mm (18 in)

Route

TGI Pipeline Network runs from Barrancabermeja to Ballena. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Barrancabermeja
To
Ballena
Start country
Colombia
End country
Colombia
Countries crossed
Colombia
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
758 km
GEM pipeline ID
P1254
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Ballena-BarrancabermejaOperatingBarrancabermeja → Ballena7712.66457 mm1996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Ballena FSRUColombiaImportProposed17.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners