LNG Chain

Gas transmission pipeline · Tas Yuryakh to Aykhal

Tas-Yuryakh-Mirny-Udachny Gas Pipeline

Tas-Yuryakh-Mirny-Udachny Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 686 km long and 1 bcm/y of capacity, starting up in 2002. It runs from Tas Yuryakh to Aykhal. It is owned by Alrosa-Gas JSC.

Length

686 km

Capacity

1 bcm/y

0.7 Mtpa LNG equivalent

Segments tracked

1

Route

Tas-Yuryakh-Mirny-Udachny Gas Pipeline runs from Tas Yuryakh to Aykhal. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tas Yuryakh
To
Aykhal
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
589 km
GEM pipeline ID
P2431
Start year
2002
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Tas-Yuryakh-Mirny-Aykhal Gas PipelineOperatingTas Yuryakh → Aykhal68612002GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies