LNG Chain

Gas transmission pipeline · Xinjiang to Qiemo County

Tarim Basin Rim Gas Pipeline Network

Tarim Basin Rim Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 651 km long, starting up in 2013. It runs from Xinjiang to Qiemo County.

Length

651 km

Capacity

Not reported

Segments tracked

1

Largest diameter 273 mm (11 in)

Route

Tarim Basin Rim Gas Pipeline Network runs from Xinjiang to Qiemo County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Xinjiang
To
Qiemo County
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
540 km
GEM pipeline ID
P6600
Start year
2013
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Hotan-Minfeng-Tanzhong SegmentOperatingXinjiang → Qiemo County651Not reported273 mm2013GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.