LNG Chain

Gas transmission pipeline · Tabatskuri to Bakuriani

Tabatskuri-Bakuriani Connector

Tabatskuri-Bakuriani Connector is a shelved gas transmission pipeline in Georgia. The tracker lists 1 tracked segment, 18 km long, starting up in 2023. It runs from Tabatskuri to Bakuriani. It is owned by Georgian Oil and Gas Corp.

Length

18 km

Capacity

Not reported

Segments tracked

1

Largest diameter 300 mm (12 in)

Route

Tabatskuri-Bakuriani Connector runs from Tabatskuri to Bakuriani. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tabatskuri
To
Bakuriani
Start country
Georgia
End country
Georgia
Countries crossed
Georgia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
22 km
GEM pipeline ID
P4241
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineShelvedTabatskuri → Bakuriani18Not reported300 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.