Gas transmission pipeline · Beryozovsky District to Yekaterinburg
SRTO-Ural Gas Pipeline
SRTO-Ural Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,986 km long and 16.2 bcm/y of capacity, starting up in 1974. It runs from Beryozovsky District to Yekaterinburg. It is owned by Gazprom PJSC.
Length
1,986 km
Capacity
16.2 bcm/y
11.9 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1220 mm (48 in)
Route
SRTO-Ural Gas Pipeline runs from Beryozovsky District to Yekaterinburg. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Beryozovsky District
- To
- Yekaterinburg
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 832 km
- GEM pipeline ID
- P2357
- Start year
- 1974
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| I | Operating | Beryozovsky District → Yekaterinburg | 1,986 | 16.2 | 1220 mm | 1974 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Gazprom PJSC100%
Parent companies
- Gazprom PJSC100%