Gas transmission pipeline · Sines to Leiria
Setubal-Leiria Pipeline
Setubal-Leiria Pipeline is an operating gas transmission pipeline in Portugal. The tracker lists 1 tracked segment, 179 km long. It runs from Sines to Leiria. It is owned by REN Gasodutos SA.
Length
179 km
Capacity
Not reported
Segments tracked
1
Largest diameter 711 mm (28 in)
Route
Setubal-Leiria Pipeline runs from Sines to Leiria. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Sines
- To
- Leiria
- Start country
- Portugal
- End country
- Portugal
- Countries crossed
- Portugal
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 245 km
- GEM pipeline ID
- P1676
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Sines → Leiria | 179 | Not reported | 711 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sines LNG Terminal | Portugal | Import | Operating | 0 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- REN Gasodutos SA100%