Gas transmission pipeline · Mamonal to Caracolí
Promigas Pipeline Network
Promigas Pipeline Network is an operating gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 135 km long and 1.02 bcm/y of capacity, starting up in 2020. It runs from Mamonal to Caracolí. It is owned by Promigas.
Length
135 km
Capacity
1.02 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Promigas Pipeline Network runs from Mamonal to Caracolí. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mamonal
- To
- Caracolí
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 91 km
- GEM pipeline ID
- P2187
- Start year
- 2020
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 2 Expansion | Operating | Mamonal → Caracolí | 135 | 1.02 | 508 mm | 2020 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Puerto Bahía LNG Terminal | Colombia | Import | Proposed | 8.8 km | route proximity |
| Cartagena FSRU (Colombia) | Colombia | Import | Operating | 10.4 km | route proximity |
| Colombia FLNG Terminal | Colombia | Export | Cancelled | 13.3 km | route proximity |
| Amazónica LNG Terminal | Colombia | Import | Proposed | 16.4 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Promigas100%
Parent companies
- Promigas SA ESP100%