LNG Chain

Gas transmission pipeline · Texas to Agua Dulce Hub

Pecos Trail Pipeline

Pecos Trail Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 753 km long and 18.91 bcm/y of capacity, starting up in 2019. It runs from Texas to Agua Dulce Hub. It is owned by Pecos Trail Pipeline Co.

Length

753 km

Capacity

18.9 bcm/y

13.9 Mtpa LNG equivalent

Segments tracked

1

Route

Pecos Trail Pipeline runs from Texas to Agua Dulce Hub. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Texas
To
Agua Dulce Hub
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
737 km
GEM pipeline ID
P0289
Start year
2019
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledTexas → Agua Dulce Hub75318.92019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Coastal Bend LNG TerminalUnited StatesExportProposed13.4 kmroute proximity
South Texas LNG TerminalUnited StatesExportCancelled18.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.