Gas transmission pipeline · Dalu Town, Jungar Banner to Erlintu Township, Shenmu County
Ordos-Anping-Cangzhou Gas Pipeline
Ordos-Anping-Cangzhou Gas Pipeline is a cancelled gas transmission pipeline in China. The tracker lists 1 tracked segment, 247 km long and 13.6 bcm/y of capacity. It runs from Dalu Town, Jungar Banner to Erlintu Township, Shenmu County. It is owned by National Pipe Network Group North Pipeline Co Ltd.
Length
247 km
Capacity
13.6 bcm/y
10.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Ordos-Anping-Cangzhou Gas Pipeline runs from Dalu Town, Jungar Banner to Erlintu Township, Shenmu County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Dalu Town, Jungar Banner
- To
- Erlintu Township, Shenmu County
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 172 km
- GEM pipeline ID
- P5006
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Jungger-Shenmu Branch | Cancelled | Dalu Town, Jungar Banner → Erlintu Township, Shenmu County | 247 | 13.6 | 914 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Cangzhou LNG Terminal | China | Import | Shelved | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.