Gas transmission pipeline · Zlobin to Bosiljevo
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is an operating gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 58 km long and 1.84 bcm/y of capacity, starting up in 2025. It runs from Zlobin to Bosiljevo. It is owned by Plinacro Ltd.
Length
58 km
Capacity
1.84 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 800 mm (31 in)
Route
Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline runs from Zlobin to Bosiljevo. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Zlobin
- To
- Bosiljevo
- Start country
- Croatia
- End country
- Croatia
- Countries crossed
- Croatia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 320 km
- GEM pipeline ID
- P2190
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Zlobin - Bosiljevo | Operating | Zlobin → Bosiljevo | 58 | 1.84 | 800 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Adria LNG Terminal | Croatia | Import | Cancelled | 0.5 km | route proximity |
| Krk FSRU | Croatia | Import | Operating | 2.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinacro Ltd100%
Parent companies
- Plinacro doo100%