LNG Chain

Gas transmission pipeline · Zlobin to Bosiljevo

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline is an operating gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 58 km long and 1.84 bcm/y of capacity, starting up in 2025. It runs from Zlobin to Bosiljevo. It is owned by Plinacro Ltd.

Length

58 km

Capacity

1.84 bcm/y

1.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 800 mm (31 in)

Route

Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline runs from Zlobin to Bosiljevo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Zlobin
To
Bosiljevo
Start country
Croatia
End country
Croatia
Countries crossed
Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
320 km
GEM pipeline ID
P2190
Start year
2025
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Zlobin - BosiljevoOperatingZlobin → Bosiljevo581.84800 mm2025GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Adria LNG TerminalCroatiaImportCancelled0.5 kmroute proximity
Krk FSRUCroatiaImportOperating2.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies