Gas transmission pipeline · Jobo to Medellín
Northwestern Gas Pipeline
Northwestern Gas Pipeline is a cancelled gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 289 km long and 1.02 bcm/y of capacity, starting up in 2023. It runs from Jobo to Medellín. It is owned by Canacol Energy.
Length
289 km
Capacity
1.02 bcm/y
0.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 559 mm (22 in)
Route
Northwestern Gas Pipeline runs from Jobo to Medellín. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Jobo
- To
- Medellín
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 267 km
- GEM pipeline ID
- P2185
- Start year
- 2023
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 1 | Cancelled | Jobo → Medellín | 289 | 1.02 | 559 mm | 2023 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Canacol Energy100%
Parent companies
- Canacol Energy100%