Gas transmission pipeline · Mariquita to Bogotá
Northwestern Gas Pipeline
Northwestern Gas Pipeline is a cancelled gas transmission pipeline in Colombia. The tracker lists 1 tracked segment, 105 km long, starting up in 2028. It runs from Mariquita to Bogotá. It is owned by Canacol Energy.
Length
105 km
Capacity
Not reported
Segments tracked
1
Route
Northwestern Gas Pipeline runs from Mariquita to Bogotá. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Mariquita
- To
- Bogotá
- Start country
- Colombia
- End country
- Colombia
- Countries crossed
- Colombia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 111 km
- GEM pipeline ID
- P3994
- Start year
- 2028
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Phase 3 | Cancelled | Mariquita → Bogotá | 105 | Not reported | — | 2028 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Canacol Energy100%
Parent companies
- Canacol Energy100%