LNG Chain

Gas transmission pipeline · Tiblisi to Yerevan

North Caucasus-Transcaucasia Gas Pipeline

North Caucasus-Transcaucasia Gas Pipeline is an operating gas transmission pipeline crossing Russia, Georgia. The tracker lists 1 tracked segment, 221 km long and 12 bcm/y of capacity, starting up in 1988. It runs from Tiblisi to Yerevan. It is owned by Georgian Oil and Gas Corp.

Length

221 km

Capacity

12 bcm/y

8.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

North Caucasus-Transcaucasia Gas Pipeline runs from Tiblisi to Yerevan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tiblisi
To
Yerevan
Start country
Georgia
End country
Armenia
Countries crossed
Russia, Georgia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
222 km
GEM pipeline ID
P1472
Start year
1988
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Tiblisi-YerevanOperatingTiblisi → Yerevan22112500 mm1988GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.