LNG Chain

Gas transmission pipeline · Batajnica to Paracin

Nooros–Abu Madi–El Gamil Gas Pipline

Nooros–Abu Madi–El Gamil Gas Pipline is an operating gas transmission pipeline in Serbia. The tracker lists 1 tracked segment, 173 km long. It runs from Batajnica to Paracin. It is owned by Srbijagas.

Length

173 km

Capacity

Not reported

Segments tracked

1

Largest diameter 610 mm (24 in)

Route

Nooros–Abu Madi–El Gamil Gas Pipline runs from Batajnica to Paracin. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Batajnica
To
Paracin
Start country
Serbia
End country
Serbia
Countries crossed
Serbia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
173 km
GEM pipeline ID
P4366
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Batajnica-ParacinOperatingBatajnica → Paracin173Not reported610 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies