LNG Chain

Gas transmission pipeline · Nadym to Punga

Nadym-Punga Gas Pipeline

Nadym-Punga Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 605 km long and 14 bcm/y of capacity, starting up in 1974. It runs from Nadym to Punga. It is owned by Gazprom PJSC.

Length

605 km

Capacity

14 bcm/y

10.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1220 mm (48 in)

Route

Nadym-Punga Gas Pipeline runs from Nadym to Punga. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Nadym
To
Punga
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
565 km
GEM pipeline ID
P4145
Start year
1974
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IIOperatingNadym → Punga605141220 mm1974GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies