LNG Chain

Gas transmission pipeline · Montesano to Buccino

Montesano-Buccino Gas Pipeline

Montesano-Buccino Gas Pipeline is an operating gas transmission pipeline in Italy. The tracker lists 1 tracked segment, 57 km long, starting up in 1993. It runs from Montesano to Buccino. It is owned by Snam Rete Gas SpA.

Length

57 km

Capacity

Not reported

Segments tracked

1

Largest diameter 1200 mm (47 in)

Route

Montesano-Buccino Gas Pipeline runs from Montesano to Buccino. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Montesano
To
Buccino
Start country
Italy
End country
Italy
Countries crossed
Italy
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
60 km
GEM pipeline ID
P4275
Start year
1993
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingMontesano → Buccino57Not reported1200 mm1993GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies