LNG Chain

Gas transmission pipeline · Los Ramones to Cempoala

Los Ramones-Cempoala Gas Pipeline

Los Ramones-Cempoala Gas Pipeline is a cancelled gas transmission pipeline in Mexico. The tracker lists 1 tracked segment, 855 km long, starting up in 2024. It runs from Los Ramones to Cempoala.

Length

855 km

Capacity

Not reported

Segments tracked

1

Route

Los Ramones-Cempoala Gas Pipeline runs from Los Ramones to Cempoala. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Los Ramones
To
Cempoala
Start country
Mexico
End country
Mexico
Countries crossed
Mexico
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
763 km
GEM pipeline ID
P2243
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledLos Ramones → Cempoala855Not reported2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Altamira LNG TerminalMexicoImportOperating0.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.