Gas transmission pipeline · Kysyl-Syr to Khabarovsk Krai
Kysyl-Syr-Amga-Ayan Gas Pipeline
Kysyl-Syr-Amga-Ayan Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,358 km long and 28 bcm/y of capacity, starting up in 2027. It runs from Kysyl-Syr to Khabarovsk Krai. It is owned by Globaltec LLC.
Length
1,358 km
Capacity
28 bcm/y
20.6 Mtpa LNG equivalent
Segments tracked
1
Route
Kysyl-Syr-Amga-Ayan Gas Pipeline runs from Kysyl-Syr to Khabarovsk Krai. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kysyl-Syr
- To
- Khabarovsk Krai
- Start country
- Russia
- End country
- Russia
- Countries crossed
- Russia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 1,217 km
- GEM pipeline ID
- P3896
- Start year
- 2027
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Kysyl-Syr → Khabarovsk Krai | 1,358 | 28 | — | 2027 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Yakutia LNG Project | Russia | Export | Shelved | 0.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Globaltec LLC100%
Parent companies
- Globaltec LLC100%