LNG Chain

Gas transmission pipeline · Chelyabinsk region to Magnitogorsk

Kartaly-Magnitogorsk Gas Pipeline

Kartaly-Magnitogorsk Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 150 km long and 4.8 bcm/y of capacity, starting up in 1963. It runs from Chelyabinsk region to Magnitogorsk. It is owned by Gazprom PJSC.

Length

150 km

Capacity

4.8 bcm/y

3.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 720 mm (28 in)

Route

Kartaly-Magnitogorsk Gas Pipeline runs from Chelyabinsk region to Magnitogorsk. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Chelyabinsk region
To
Magnitogorsk
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
134 km
GEM pipeline ID
P2320
Start year
1963
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
IOperatingChelyabinsk region → Magnitogorsk1504.8720 mm1963GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies