Gas transmission pipeline · Kadanwari to Karachi
Kadanwari-Malir-Karachi Gas Pipeline
Kadanwari-Malir-Karachi Gas Pipeline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 412 km long and 1.84 bcm/y of capacity. It runs from Kadanwari to Karachi. It is owned by Sui Southern Gas Co (SSGC).
Length
412 km
Capacity
1.84 bcm/y
1.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Kadanwari-Malir-Karachi Gas Pipeline runs from Kadanwari to Karachi. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Kadanwari
- To
- Karachi
- Start country
- Pakistan
- End country
- Pakistan
- Countries crossed
- Pakistan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 407 km
- GEM pipeline ID
- P4015
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Kadanwari → Karachi | 412 | 1.84 | 610 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Energas FSRU | Pakistan | Import | Proposed | 14.9 km | route proximity |
| GasPort FSRU 2 | Pakistan | Import | Proposed | 14.9 km | route proximity |
| Engro FSRU 2 | Pakistan | Import | Cancelled | 15.2 km | route proximity |
| Mashal LNG Terminal | Pakistan | Import | Cancelled | 15.2 km | route proximity |
| GEIL FSRU | Pakistan | Import | Cancelled | 15.5 km | route proximity |
| GasPort FSRU | Pakistan | Import | Operating | 16.7 km | route proximity |
| LNG Easy Floating LNG Terminal | Pakistan | Import | Shelved | 23.2 km | route proximity |
| Tabeer LNG Terminal | Pakistan | Import | Shelved | 24.8 km | route proximity |
| Pakistan State Oil LNG Terminal | Pakistan | Import | Cancelled | 24.9 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.