LNG Chain

Gas transmission pipeline · Pizhou to Sheyang County

Jiangsu Coastal Gas Pipeline

Jiangsu Coastal Gas Pipeline is a cancelled gas transmission pipeline in China. The tracker lists 1 tracked segment, 332 km long and 7.28 bcm/y of capacity. It runs from Pizhou to Sheyang County.

Length

332 km

Capacity

7.28 bcm/y

5.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 711 mm (28 in)

Route

Jiangsu Coastal Gas Pipeline runs from Pizhou to Sheyang County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Pizhou
To
Sheyang County
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
181 km
GEM pipeline ID
P4773
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Xuzhou–Suqian–Huai'an–Yancheng PipelineCancelledPizhou → Sheyang County3327.28711 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Coastal Bend LNG TerminalUnited StatesExportProposedname match
Rudong LNG Terminal (Jiangsu Guoxin)ChinaImportUnder constructionname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.