Gas transmission pipeline · Dafeng District to Xuyi County
Jiangsu Coastal Gas Pipeline
Jiangsu Coastal Gas Pipeline is a proposed gas transmission pipeline in China. The tracker lists 1 tracked segment, 254 km long and 2.38 bcm/y of capacity. It runs from Dafeng District to Xuyi County.
Length
254 km
Capacity
2.38 bcm/y
1.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Jiangsu Coastal Gas Pipeline runs from Dafeng District to Xuyi County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Dafeng District
- To
- Xuyi County
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 225 km
- GEM pipeline ID
- P4759
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Dafeng–Yancheng–Xuyi Pipeline | Proposed | Dafeng District → Xuyi County | 254 | 2.38 | 508 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Coastal Bend LNG Terminal | United States | Export | Proposed | — | name match |
| Rudong LNG Terminal (Jiangsu Guoxin) | China | Import | Under construction | — | name match |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Ownership is not reported for this pipeline.