LNG Chain

Gas transmission pipeline · Tabriz to Sardarian

Iran-Armenia Gas Pipeline

Iran-Armenia Gas Pipeline is an operating gas transmission pipeline crossing Iran, Armenia. The tracker lists 1 tracked segment, 141 km long and 2.27 bcm/y of capacity, starting up in 2007. It runs from Tabriz to Sardarian. It is owned by Iran Ministry of Petroleum and Gazprom PJSC.

Length

141 km

Capacity

2.27 bcm/y

1.7 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 700 mm (28 in)

Route

Iran-Armenia Gas Pipeline runs from Tabriz to Sardarian. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tabriz
To
Sardarian
Start country
Iran
End country
Armenia
Countries crossed
Iran, Armenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
92 km
GEM pipeline ID
P0449
Start year
2007
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingTabriz → Sardarian1412.27700 mm2007GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.