LNG Chain

Gas transmission pipeline · Yuanbaoshan District Chaoyang to Songshan

Inner Mongolia Gas Pipeline Network

Inner Mongolia Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 30 km long and 0.34 bcm/y of capacity, starting up in 2022. It runs from Yuanbaoshan District Chaoyang to Songshan.

Length

30 km

Capacity

0.34 bcm/y

0.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 450 mm (18 in)

Route

Inner Mongolia Gas Pipeline Network runs from Yuanbaoshan District Chaoyang to Songshan. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Yuanbaoshan District Chaoyang
To
Songshan
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
28 km
GEM pipeline ID
P6236
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Chifeng Northeast loop gas pipelineOperatingYuanbaoshan District Chaoyang → Songshan300.34450 mm2022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.