Gas transmission pipeline · Bid Boland Gas Refinery to Astara
IGAT 1 Gas Pipeline
IGAT 1 Gas Pipeline is an operating gas transmission pipeline crossing Iran, Azerbaijan. The tracker lists 1 tracked segment, 1,103 km long and 17 bcm/y of capacity, starting up in 1970. It runs from Bid Boland Gas Refinery to Astara. It is owned by National Iranian Gas Company.
Length
1,103 km
Capacity
17 bcm/y
12.5 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
IGAT 1 Gas Pipeline runs from Bid Boland Gas Refinery to Astara. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Bid Boland Gas Refinery
- To
- Astara
- Start country
- Iran
- End country
- Iran
- Countries crossed
- Iran, Azerbaijan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 1,087 km
- GEM pipeline ID
- P3957
- Start year
- 1970
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Bid Boland Gas Refinery → Astara | 1,103 | 17 | 1067 mm | 1970 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.