LNG Chain

Gas transmission pipeline · Honggang voltage regulating station to Aungangxi Terminal Station

Heilongjiang Natural Gas Pipeline Network

Heilongjiang Natural Gas Pipeline Network is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 156 km long and 0.82 bcm/y of capacity, starting up in 2008. It runs from Honggang voltage regulating station to Aungangxi Terminal Station. It is owned by Daqing Oilfield Co Ltd.

Length

156 km

Capacity

0.82 bcm/y

0.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 406 mm (16 in)

Route

Heilongjiang Natural Gas Pipeline Network runs from Honggang voltage regulating station to Aungangxi Terminal Station. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Honggang voltage regulating station
To
Aungangxi Terminal Station
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
116 km
GEM pipeline ID
P5066
Start year
2008
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Daqing-Qiqihar Gas PipelineOperatingHonggang voltage regulating station → Aungangxi Terminal Station1560.82406 mm2008GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.