Gas transmission pipeline · Haradh Gas Plant to Uthmaniyah Gas Plant
Haradh-Uthmaniya Gas Pipeline
Haradh-Uthmaniya Gas Pipeline is an operating gas transmission pipeline in Saudi Arabia. The tracker lists 1 tracked segment, 140 km long, starting up in 2006. It runs from Haradh Gas Plant to Uthmaniyah Gas Plant. It is owned by Saudi Aramco.
Length
140 km
Capacity
Not reported
Segments tracked
1
Largest diameter 1219 mm (48 in)
Route
Haradh-Uthmaniya Gas Pipeline runs from Haradh Gas Plant to Uthmaniyah Gas Plant. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Haradh Gas Plant
- To
- Uthmaniyah Gas Plant
- Start country
- Saudi Arabia
- End country
- Saudi Arabia
- Countries crossed
- Saudi Arabia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 136 km
- GEM pipeline ID
- P1905
- Start year
- 2006
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Haradh Gas Plant → Uthmaniyah Gas Plant | 140 | Not reported | 1219 mm | 2006 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Saudi Aramco100%