Gas transmission pipeline · Hajigabul (Kazi Magomed) to Mozdok
Hajigabul-Shirvanovka-Mozdok Pipeline
Hajigabul-Shirvanovka-Mozdok Pipeline is an operating gas transmission pipeline crossing Russia, Azerbaijan. The tracker lists 1 tracked segment, 680 km long and 10 bcm/y of capacity, starting up in 1982. It runs from Hajigabul (Kazi Magomed) to Mozdok. It is owned by SOCAR and Gazprom PJSC.
Length
680 km
Capacity
10 bcm/y
7.4 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1220 mm (48 in)
Route
Hajigabul-Shirvanovka-Mozdok Pipeline runs from Hajigabul (Kazi Magomed) to Mozdok. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hajigabul (Kazi Magomed)
- To
- Mozdok
- Start country
- Azerbaijan
- End country
- Russia
- Countries crossed
- Russia, Azerbaijan
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 693 km
- GEM pipeline ID
- P0751
- Start year
- 1982
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Hajigabul (Kazi Magomed) → Mozdok | 680 | 10 | 1220 mm | 1982 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.