LNG Chain

Gas transmission pipeline · Hajigabul to Saguramo

Hajigabul-Gazakh-Saguramo Pipeline

Hajigabul-Gazakh-Saguramo Pipeline is an operating gas transmission pipeline crossing Azerbaijan, Georgia. The tracker lists 1 tracked segment, 478 km long and 8.7 bcm/y of capacity, starting up in 2006. It runs from Hajigabul to Saguramo. It is owned by SOCAR and Georgian Oil and Gas Corp.

Length

478 km

Capacity

8.7 bcm/y

6.4 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1000 mm (39 in)

Route

Hajigabul-Gazakh-Saguramo Pipeline runs from Hajigabul to Saguramo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hajigabul
To
Saguramo
Start country
Azerbaijan
End country
Georgia
Countries crossed
Azerbaijan, Georgia
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
456 km
GEM pipeline ID
P4211
Start year
2006
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingHajigabul → Saguramo4788.71000 mm2006GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.