LNG Chain

Gas transmission pipeline · Coyanosa to Agua Dulce

Gulf Coast Express Pipeline

Gulf Coast Express Pipeline is an operating gas transmission pipeline in United States. The tracker lists 1 tracked segment, 801 km long and 20.24 bcm/y of capacity, starting up in 2019. It runs from Coyanosa to Agua Dulce. It is owned by Gulf Coast Express Pipeline LLC.

Length

801 km

Capacity

20.2 bcm/y

14.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Gulf Coast Express Pipeline runs from Coyanosa to Agua Dulce. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Coyanosa
To
Agua Dulce
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
853 km
GEM pipeline ID
P0378
Start year
2019
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Main LineOperatingCoyanosa → Agua Dulce80120.2914 mm2019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.