LNG Chain

Gas transmission pipeline · Mitino to Yermakovo

Gorky-Cherepovets Gas Pipeline

Gorky-Cherepovets Gas Pipeline is a proposed gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 60 km long and 11.27 bcm/y of capacity, starting up in 2026. It runs from Mitino to Yermakovo. It is owned by Gazprom PJSC.

Length

60 km

Capacity

11.3 bcm/y

8.3 Mtpa LNG equivalent

Segments tracked

1

Route

Gorky-Cherepovets Gas Pipeline runs from Mitino to Yermakovo. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Mitino
To
Yermakovo
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
647 km
GEM pipeline ID
P4012
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Burmakino-Rybinsk Gas PipelineProposedMitino → Yermakovo6011.32026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies