LNG Chain

Gas transmission pipeline · Bandurria to Cabo Negro

Gasoducto Magallanes Gas Pipeline

Gasoducto Magallanes Gas Pipeline is an operating gas transmission pipeline in Chile. The tracker lists 1 tracked segment, 105 km long and 3.07 bcm/y of capacity, starting up in 1996. It runs from Bandurria to Cabo Negro. It is owned by ENAP Magallanes.

Length

105 km

Capacity

3.07 bcm/y

2.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1044727 mm (41131 in)

Route

Gasoducto Magallanes Gas Pipeline runs from Bandurria to Cabo Negro. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bandurria
To
Cabo Negro
Start country
Chile
End country
Chile
Countries crossed
Chile
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
511 km
GEM pipeline ID
P7697
Start year
1996
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingBandurria → Cabo Negro1053.071044727 mm1996GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners