LNG Chain

Gas transmission pipeline · Chachoengsao to Nonthaburi

Fifth Gas Transmission Pipeline Project

Fifth Gas Transmission Pipeline Project is an operating gas transmission pipeline in Thailand. The tracker lists 1 tracked segment, 200 km long and 20.44 bcm/y of capacity, starting up in 2024. It runs from Chachoengsao to Nonthaburi. It is owned by PTT Public Co Ltd.

Length

200 km

Capacity

20.4 bcm/y

15.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Fifth Gas Transmission Pipeline Project runs from Chachoengsao to Nonthaburi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Chachoengsao
To
Nonthaburi
Start country
Thailand
End country
Thailand
Countries crossed
Thailand
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
395 km
GEM pipeline ID
P1442
Start year
2024
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Phase II & IIIOperatingChachoengsao → Nonthaburi20020.41067 mm2024GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Map Ta Phut LNG Terminal 2ThailandImportOperating0.4 kmroute proximity
Map Ta Phut LNG Terminal 1ThailandImportOperating0.9 kmroute proximity
Map Ta Phut LNG Terminal 3ThailandImportUnder construction1.7 kmroute proximity
Cambodia LNG ProjectCambodiaImportCancelledname match
Filipinas LNG Gateway Project FSRUPhilippinesImportShelvedname match
Project Venezuela LNG TerminalVenezuelaExportCancelledname match
Yakutia LNG ProjectRussiaExportShelvedname match

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies