LNG Chain

Gas transmission pipeline · Hilala gas field to Damerdjog

Ethiopia–Djibouti Gas Pipeline

Ethiopia–Djibouti Gas Pipeline is a cancelled gas transmission pipeline crossing Djibouti, Ethiopia. The tracker lists 1 tracked segment, 767 km long and 12 bcm/y of capacity, starting up in 2022. It runs from Hilala gas field to Damerdjog. It is owned by GCL-Poly.

Length

767 km

Capacity

12 bcm/y

8.8 Mtpa LNG equivalent

Segments tracked

1

Route

Ethiopia–Djibouti Gas Pipeline runs from Hilala gas field to Damerdjog. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Hilala gas field
To
Damerdjog
Start country
Ethiopia
End country
Djibouti
Countries crossed
Djibouti, Ethiopia
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
729 km
GEM pipeline ID
P2196
Start year
2022
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledHilala gas field → Damerdjog767122022GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Djibouti FLNG TerminalDjiboutiExportCancelled2.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies