Gas transmission pipeline · Cygnus Gas Field to Bacton Terminal
Esmond Transmission System Pipeline
Esmond Transmission System Pipeline is an operating gas transmission pipeline in United Kingdom. The tracker lists 1 tracked segment, 165 km long, starting up in 1985. It runs from Cygnus Gas Field to Bacton Terminal. It is owned by Kellas Midstream Ltd, Ithaca Energy and Harbour Energy plc.
Length
165 km
Capacity
Not reported
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
Esmond Transmission System Pipeline runs from Cygnus Gas Field to Bacton Terminal. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Cygnus Gas Field
- To
- Bacton Terminal
- Start country
- United Kingdom
- End country
- United Kingdom
- Countries crossed
- United Kingdom
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 166 km
- GEM pipeline ID
- P7438
- Start year
- 1985
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Cygnus Gas Field → Bacton Terminal | 165 | Not reported | 610 mm | 1985 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.