LNG Chain

Gas transmission pipeline · Horsley Park to Kurri Kurri

Eastern Gas Pipeline

Eastern Gas Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 185 km long and 3.01 bcm/y of capacity, starting up in 2023. It runs from Horsley Park to Kurri Kurri. It is owned by Jemena.

Length

185 km

Capacity

3.01 bcm/y

2.2 Mtpa LNG equivalent

Segments tracked

1

Route

Eastern Gas Pipeline runs from Horsley Park to Kurri Kurri. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Horsley Park
To
Kurri Kurri
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
135 km
GEM pipeline ID
P2073
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Sydney to Hunter Valley ExtensionCancelledHorsley Park → Kurri Kurri1853.012023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Newcastle FSRUAustraliaImportCancelled10.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners