LNG Chain

Gas transmission pipeline · Donji Miholjac to Belišće

Donji Miholjac–Belišće Gas pipeline

Donji Miholjac–Belišće Gas pipeline is an operating gas transmission pipeline in Croatia. The tracker lists 1 tracked segment, 20 km long and 1.05 bcm/y of capacity, starting up in 2020. It runs from Donji Miholjac to Belišće. It is owned by Plinacro Ltd.

Length

20 km

Capacity

1.05 bcm/y

0.8 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 400 mm (16 in)

Route

Donji Miholjac–Belišće Gas pipeline runs from Donji Miholjac to Belišće. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Donji Miholjac
To
Belišće
Start country
Croatia
End country
Croatia
Countries crossed
Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
20 km
GEM pipeline ID
P3416
Start year
2020
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingDonji Miholjac → Belišće201.05400 mm2020GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies