LNG Chain

Gas transmission pipeline · Dadu to Karachi

Dadu-Malir-Karachi Gas Pipeline

Dadu-Malir-Karachi Gas Pipeline is an operating gas transmission pipeline in Pakistan. The tracker lists 1 tracked segment, 250 km long and 4.09 bcm/y of capacity. It runs from Dadu to Karachi. It is owned by Sui Southern Gas Co (SSGC).

Length

250 km

Capacity

4.09 bcm/y

3.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 508 mm (20 in)

Route

Dadu-Malir-Karachi Gas Pipeline runs from Dadu to Karachi. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Dadu
To
Karachi
Start country
Pakistan
End country
Pakistan
Countries crossed
Pakistan
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
240 km
GEM pipeline ID
P4019
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingDadu → Karachi2504.09508 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
GasPort FSRUPakistanImportOperating19.6 kmroute proximity
Energas FSRUPakistanImportProposed21.2 kmroute proximity
GasPort FSRU 2PakistanImportProposed21.2 kmroute proximity
Engro FSRU 2PakistanImportCancelled21.5 kmroute proximity
Mashal LNG TerminalPakistanImportCancelled21.5 kmroute proximity
GEIL FSRUPakistanImportCancelled21.6 kmroute proximity
LNG Easy Floating LNG TerminalPakistanImportShelved23.2 kmroute proximity
Tabeer LNG TerminalPakistanImportShelved24.8 kmroute proximity
Pakistan State Oil LNG TerminalPakistanImportCancelled24.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.