Gas transmission pipeline · Eneva Hub Sergipe to Carmópolis
CT Sergipe Gas Pipeline
CT Sergipe Gas Pipeline is an operating gas transmission pipeline in Brazil. The tracker lists 1 tracked segment, 25 km long and 5.11 bcm/y of capacity, starting up in 2024. It runs from Eneva Hub Sergipe to Carmópolis. It is owned by CDPQ, ENGIE SA and Engie Brasil Energia.
Length
25 km
Capacity
5.11 bcm/y
3.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
CT Sergipe Gas Pipeline runs from Eneva Hub Sergipe to Carmópolis. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Eneva Hub Sergipe
- To
- Carmópolis
- Start country
- Brazil
- End country
- Brazil
- Countries crossed
- Brazil
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 26 km
- GEM pipeline ID
- P7791
- Start year
- 2024
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Porto Sergipe-Catu Pilar Gas Pipeline | Operating | Eneva Hub Sergipe → Carmópolis | 25 | 5.11 | 610 mm | 2024 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Sergipe FSRU | Brazil | Import | Operating | 7.2 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- CDPQ50%
- ENGIE SA32.5%
- Engie Brasil Energia17.5%