Gas transmission pipeline · Susquehanna County to Schoharie County
Constitution Gas Pipeline
Constitution Gas Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 184 km long and 6.64 bcm/y of capacity, starting up in 2022. It runs from Susquehanna County to Schoharie County. It is owned by Williams Companies, Coterra Energy Inc and Duke Energy Corp.
Length
184 km
Capacity
6.64 bcm/y
4.9 Mtpa LNG equivalent
Segments tracked
1
Route
Constitution Gas Pipeline runs from Susquehanna County to Schoharie County. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Susquehanna County
- To
- Schoharie County
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 184 km
- GEM pipeline ID
- P0171
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Susquehanna County → Schoharie County | 184 | 6.64 | — | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.