Gas transmission pipeline · Tianjin to Dingxing

CNOOC Coal Gasification Transmission Pipeline

CNOOC Coal Gasification Transmission Pipeline is an operating gas transmission pipeline in China. The tracker lists 1 tracked segment, 414 km long and 6.6 bcm/y of capacity, starting up in 2023. It runs from Tianjin to Dingxing.

Length

414 km

Capacity

6.6 bcm/y

4.9 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1016 mm (40 in)

Route

CNOOC Coal Gasification Transmission Pipeline runs from Tianjin to Dingxing. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Tianjin
To
Dingxing
Start country
China
End country
China
Countries crossed
China
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
154 km
GEM pipeline ID
P7713
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
First phase (Tianjin-Dingxing)OperatingTianjin → Dingxing4146.61016 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Tianjin LNG Terminal (PipeChina)ChinaImportOperating20.6 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.