Gas transmission pipeline · Hanggin to Huanghua
CNOOC Coal Gasification Transmission Pipeline
CNOOC Coal Gasification Transmission Pipeline is a proposed gas transmission pipeline in China. The tracker lists 1 tracked segment, 1,022 km long and 20 bcm/y of capacity, starting up in 2022. It runs from Hanggin to Huanghua. It is owned by National Pipe Network Group North China Natural Gas Pipeline Co Ltd.
Length
1,022 km
Capacity
20 bcm/y
14.7 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1016 mm (40 in)
Route
CNOOC Coal Gasification Transmission Pipeline runs from Hanggin to Huanghua. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Hanggin
- To
- Huanghua
- Start country
- China
- End country
- China
- Countries crossed
- China
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 940 km
- GEM pipeline ID
- P4923
- Start year
- 2022
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Proposed | Hanggin → Huanghua | 1,022 | 20 | 1016 mm | 2022 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Tianjin LNG Terminal (PipeChina) | China | Import | Operating | 8.3 km | route proximity |
| Tianjin LNG Terminal (Sinopec) | China | Import | Operating | 19.4 km | route proximity |
| Tianjin LNG Terminal (Beijing Gas Group) | China | Import | Operating | 20.1 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.