Gas transmission pipeline · Chittagong City to Rauzan
Chittagong-Rauzan Gas Pipeline
Chittagong-Rauzan Gas Pipeline is an operating gas transmission pipeline in Bangladesh. The tracker lists 1 tracked segment, 18 km long and 1.53 bcm/y of capacity, starting up in 1980. It runs from Chittagong City to Rauzan. It is owned by Karnaphuli Gas Distribution Co Ltd (KGDCL).
Length
18 km
Capacity
1.53 bcm/y
1.1 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 508 mm (20 in)
Route
Chittagong-Rauzan Gas Pipeline runs from Chittagong City to Rauzan. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Chittagong City
- To
- Rauzan
- Start country
- Bangladesh
- End country
- Bangladesh
- Countries crossed
- Bangladesh
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 22 km
- GEM pipeline ID
- P0851
- Start year
- 1980
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Chittagong City → Rauzan | 18 | 1.53 | 508 mm | 1980 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Pertamina Bangladesh FSRU | Bangladesh | Import | Cancelled | 14.3 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.