LNG Chain

Gas transmission pipeline · Campo Maior to Leiria

Campo Maior–Leiria Pipeline

Campo Maior–Leiria Pipeline is an operating gas transmission pipeline in Portugal. The tracker lists 1 tracked segment, 219 km long. It runs from Campo Maior to Leiria. It is owned by REN Gasodutos SA.

Length

219 km

Capacity

Not reported

Segments tracked

1

Largest diameter 711 mm (28 in)

Route

Campo Maior–Leiria Pipeline runs from Campo Maior to Leiria. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Campo Maior
To
Leiria
Start country
Portugal
End country
Portugal
Countries crossed
Portugal
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
213 km
GEM pipeline ID
P1673
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingCampo Maior → Leiria219Not reported711 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.