LNG Chain

Gas transmission pipeline · Posusje to Novi Travnik

Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline

Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline is a proposed gas transmission pipeline crossing Bosnia And Herzegovina, Croatia. The tracker lists 1 tracked segment, 168 km long and 1.5 bcm/y of capacity, starting up in 2026. It runs from Posusje to Novi Travnik. It is owned by Plinacro Ltd.

Length

168 km

Capacity

1.5 bcm/y

1.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 500 mm (20 in)

Route

Bosnia and Herzegovina–Croatia South Interconnection Gas Pipeline runs from Posusje to Novi Travnik. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Posusje
To
Novi Travnik
Start country
Bosnia and Herzegovina
End country
Bosnia and Herzegovina
Countries crossed
Bosnia And Herzegovina, Croatia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
163 km
GEM pipeline ID
P1321
Start year
2026
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Posusje - Novi Travnik with branch to MostarProposedPosusje → Novi Travnik1681.5500 mm2026GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.