LNG Chain

Gas transmission pipeline · Bazargan to Halfaya

Bazargan-Halfaya Gas Pipeline

Bazargan-Halfaya Gas Pipeline is an under construction gas transmission pipeline in Iraq. The tracker lists 1 tracked segment, 70 km long and 0.72 bcm/y of capacity. It runs from Bazargan to Halfaya. It is owned by Iraq Ministry of Oil.

Length

70 km

Capacity

0.72 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 457 mm (18 in)

Route

Bazargan-Halfaya Gas Pipeline runs from Bazargan to Halfaya. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bazargan
To
Halfaya
Start country
Iraq
End country
Iraq
Countries crossed
Iraq
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
91 km
GEM pipeline ID
P6832
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionBazargan → Halfaya700.72457 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Parent companies